Ongoing Projects

-A A +A

Paving Program 2011

Streets tentatively scheduled for resurfacing in 2009 are:

  • N. Woodstock Road (Golf St to state line)
  • Alpine Drive Bridge
  • Eastford Road (Dennison Drive to state line)
  • Lebanon Hill Road

Sidewalk Replacement

Sidewalks tentatively scheduled for reconstruction in 2011 are:

  • Henry Street

Drainage Structure Repairs Approximately 45 catch basins will be rebuilt throughout the town.